ISO 45001 Incident Investigation: A Construction Near Miss Worked Example
Contact Veritas Assurance · Explore ISO 45001 certification services
An ISO 45001 incident investigation establishes what happened, what allowed it to happen and what needs to change. A near miss can reveal a serious weakness even when nobody is injured. The investigation should explain why existing controls failed and show whether the changes made afterward work under real site conditions.
This global guide follows a construction near miss under ISO 45001 Clause 10.2. It shows how the site team used evidence to trace two control failures, verified corrective action during a later delivery and shared the findings with another team. Official ISO 45001 overview · ISO/TC 283 guidance on Clause 10.2
What Is the Difference Between an Incident and a Near Miss?
An incident is a work-related occurrence that caused or could have caused injury or ill health. A near miss, also called a close call, is an incident in which neither occurred, although harm was possible.
| Situation | How to record it |
|---|---|
| A worker spots pallets obstructing a pedestrian route and reports them before anyone enters the unloading area. | Hazard or unsafe condition report. The obstruction creates the possibility of exposure to moving vehicles. |
| A worker goes around the pallets into the unloading area. A reversing vehicle stops before reaching the worker. | Near miss. Record what happened and the harm that could reasonably have followed. |
| A vehicle strikes and injures a worker. | Incident resulting in injury. Record the injury, the response and decisions about applicable notifications. |
| The investigation establishes that the site skipped the required approval and briefing for changes affecting pedestrian access. | Nonconformity linked to the incident. Identify the requirement and the evidence showing it was missed. |
A hazard is a source of potential harm, such as a moving vehicle. Exposure describes who encounters it and under what conditions. Occupational health and safety risk considers the likelihood of a hazardous event or exposure and the severity of the resulting harm. A control eliminates a hazard or reduces the risk. In this case, a designated pedestrian route helps keep people apart from moving vehicles. Veritas hazard identification and risk assessment guide
The near miss and any associated nonconformity can share a case reference. The event record explains what happened. The nonconformity record identifies the specific requirement that the evidence shows was missed. Veritas guide to managing ISO management system nonconformities
Worked Construction Scenario: A Reversing Delivery Vehicle Nearly Strikes a Worker
A principal contractor is building a commercial property. Deliveries enter through Gate 2. The approved logistics plan shows a marked pedestrian route to the building entrance and a separate vehicle unloading area.
Late one afternoon, a materials crew places pallets across part of the walking route. A supervisor sends a warning to the day-shift logistics group. The pallets remain overnight. The incoming delivery coordinator and the electrical subcontractor’s early-shift crew receive no update through their usual briefings.
At 06:48 the following morning, an electrical worker walks around the obstruction into the unloading area while a delivery vehicle is reversing. The banksman, who is directing the vehicle movement, sees the worker and signals the driver to stop. The vehicle stops before reaching the worker.
| First report field | Illustrative entry |
|---|---|
| Case reference | NM-G2-01 |
| Location and task | Gate 2 unloading area during an early-morning delivery |
| Actual outcome | No injury reported and no contact between the vehicle and worker |
| Credible potential outcome | Serious or fatal injury from a vehicle strike |
| Initial uncertainty | Whether the obstruction was formally recorded, who knew about it and whether anyone checked the pedestrian route before the delivery was cleared |
Record the actual outcome and credible potential outcome separately. In this case, the possible consequence justified a detailed investigation even though nobody was hurt. Use the potential severity and likelihood of recurrence to help determine how far the investigation should go. HSE incident investigation workbook
How the Site Responded and Investigated Under Clause 10.2
The site supervisor suspended deliveries through Gate 2, controlled access to the affected area and checked on those involved. The team recorded the positions of the pallets and barriers, retained relevant records and preserved available footage in line with site arrangements. Authorised personnel cleared and checked the walking route before the affected area returned to use. ISO/TC 283 guidance on responding to incidents
The responsible manager checked whether the event triggered notification under local requirements or the project contract. Internal reporting, statutory notification and client reporting are separate decisions. Record the requirements checked, who made the decision and what was communicated. Some jurisdictions require notification of certain serious events even when nobody is injured. Veritas guide to evaluating applicable OH&S obligations
The investigation involved the people who did and supervised the work, including the electrical subcontractor. The team compared their accounts with the site plan, supervisor’s message, handover log and delivery clearance record. It checked whether similar weaknesses existed elsewhere. Clause 10.2 also connects the findings to review of relevant risk assessments, corrective action, effectiveness verification and communication of the results. Veritas ISO 45001 practical handbook
Root Cause Analysis: Following Two Separate Control Failures
The team used a timeline to establish the sequence and a control review to identify what had failed. It then used repeated “why” questions to trace the causes. The 5 Whys is one way to structure those questions. Follow each line as far as the evidence supports it, especially when several controls failed. OSHA guidance on investigating incidents and close calls · HSE guidance on human factors in investigations
Timeline and control review
| When | What the evidence showed | What happened to the control |
|---|---|---|
| Previous afternoon | The materials crew placed pallets on part of the route. The supervisor’s warning went to the day-shift logistics group. | Part of the route became unusable. The issue was handled through an informal message. |
| Morning handover | The log contained no entry for the obstruction. The incoming coordinator and subcontractor received no update through their usual briefings. | The people who needed the information did not receive it through the handover. |
| Delivery clearance | The delivery record showed the vehicle was cleared. The release procedure contained no route-readiness check. | Entry could proceed without confirmation that pedestrians could use the approved route. |
| At 06:48 | The worker’s and banksman’s accounts established that the worker went around the pallets and the vehicle stopped before contact. | The banksman intervened after the pedestrian and vehicle were already in the same area. |
Cause path 1 — Why did the obstruction bypass change approval and handover?
| Question | Answer supported by the evidence |
|---|---|
| Why did the worker leave the marked route? | Pallets obstructed it. The worker’s account and the recorded positions of the pallets supported this. |
| Why did the obstruction stay in place overnight? | The materials crew described the placement as temporary storage. The team found no record of anyone referring it for formal review as a change affecting pedestrian access. |
| Why did the next shift and subcontractor miss the warning? | The message went to one day-shift group. The handover log contained no entry, and the incoming coordinator and subcontractor confirmed there was no update in their briefings. |
Cause conclusion. Temporary staging that affected pedestrian access could bypass the site’s formal change approval and handover process.
Cause path 2 — Why was the vehicle cleared while the route was unusable?
| Question | Answer supported by the evidence |
|---|---|
| Why did the coordinator release the delivery? | The coordinator followed the usual process. The clearance record showed that the release went ahead. |
| Why could the usual process allow entry under these conditions? | The procedure had no step requiring someone to confirm that the approved pedestrian route was usable. |
| Why was there no hold when conditions differed from the site plan? | The procedure did not identify who would verify the route or who could hold vehicle entry if the route could not be confirmed. |
Cause conclusion. Delivery clearance did not account for current pedestrian access conditions. The site needed an assigned route check and clear authority to pause entry.
The immediate factors were the blocked route and the overlap between pedestrian and vehicle movement. The missed handover contributed to the event. The two process weaknesses explain how the obstruction persisted across shifts and why the vehicle could still enter. The team checked the other delivery areas and found that Gate 3 used the same clearance and handover arrangements.
Corrective Action and Effectiveness Verification
Immediate response controlled the situation by suspending deliveries and restricting access. Correction removed the pallets and restored the approved route. Corrective action addressed the staging, handover and delivery clearance weaknesses that had allowed the near miss.
Before implementing the changes, the site assessed whether moving the staging area could obstruct another access route or introduce a new vehicle–pedestrian crossing. It reviewed the proposed arrangement with the crews affected. Veritas hazard identification and risk assessment guide
| Finding | Corrective action and owner | What had to be true for the action to pass | Illustrative verification result |
|---|---|---|---|
| Temporary staging could block the pedestrian route. | Logistics manager: Designate a staging area and update the site layout. | Workers can use the approved route from entry to destination while unloading takes place. | The route remained usable during 12 observed deliveries, including early-shift activity and a busy unloading period. |
| A change could carry into another shift without reaching affected teams. | Site manager: Require formal review and handover for temporary changes affecting pedestrian access. Include relevant subcontractors and record who received the update. | The incoming shift and affected subcontractors receive the approved arrangements before their work starts. | A later unplanned change appeared in the handover record. The incoming crew and electrical subcontractor confirmed receipt before starting work. |
| A delivery could proceed without a verified pedestrian route. | Delivery coordinator: Add a route-readiness check and assign authority to hold vehicle entry. | Entry is held whenever the approved route or required communication cannot be confirmed. | During the later change, entry was held. The release record showed when the route was checked and when the affected teams received the update. |
The updated layout, handover form and clearance record showed that the changes were implemented. The later unplanned change provided the strongest effectiveness evidence because it tested the decision that mattered. The coordinator held the delivery until the site confirmed that the pedestrian route was usable and the affected teams had received the update.
The 12 deliveries are part of the illustrative case. Choose a verification period and sample that reflect the risk, the frequency of work and the conditions under which the control needs to operate. If a review misses a relevant shift or the type of disruption that caused the event, keep that part of the review open.
Communicating the Incident and Closing the Lessons-Learned Loop
| Stage | What to communicate | How to check it reached the right people |
|---|---|---|
| Initial response | Explain which area is affected, what has been suspended and who can authorise the next step. | Confirm receipt with the incoming shift, delivery coordination and affected subcontractors. |
| Investigation | Ask workers what they saw, what they knew and how the work was planned. Protect personal information and record uncertainty. | Document worker input and show how it was considered in the investigation. |
| Before implementing the changes | Explain where materials can be staged, how access changes are recorded and who can hold vehicle entry. | Ask workers and supervisors what they would do if the approved route became unavailable. |
| After verification | Share the confirmed causes, changes and what the later delivery hold showed. Ask teams with similar arrangements to check their own work. | Track who owns each local review, what the team found and what action it took. |
Example lessons-learned notice
Event: A blocked pedestrian route led a worker into an unloading area during vehicle movement. The banksman stopped the vehicle before contact.
Finding: The obstruction was treated as temporary storage and missed during handover. Delivery clearance could proceed without confirming that the pedestrian route was usable.
Change: Use the designated staging area. Put changes affecting pedestrian access through formal approval and handover. Confirm route readiness and required briefings before allowing vehicle entry.
Action for other teams: Check your local route, handover and delivery clearance arrangements. Record any gap, the person responsible and how the change will be verified.
How Gate 3 reported back. The Gate 3 logistics supervisor checked the local process and confirmed that delivery clearance could proceed without a route-readiness check. The supervisor added the approved check, observed its use during an early-shift delivery involving a subcontractor and sent the updated clearance record and observation result to the project OH&S lead. The lead recorded that response against NM-G2-01. This gave the originating team evidence of what Gate 3 did with the lesson. OSHA guidance on worker participation
What to Keep in an ISO 45001 Incident Investigation Record
First report: Reference, date, time, location, activity, actual outcome and credible potential harm.
Response and notifications: Immediate controls, decisions about external reporting and who checked conditions before work resumed.
Evidence and worker input: Plans, records, accounts, confirmed facts and unresolved points.
Cause analysis: The event sequence, failed or missing controls, and findings from checking similar work.
Corrective action and risk review: Each action, the cause addressed, owner, due date, implementation evidence and any new or changed hazards assessed.
Verification and closure: What was checked, under which conditions, how it compared with the agreed criteria and who approved closure.
Communication: Workers, representatives and other relevant parties informed, with feedback from teams asked to apply the lesson.
Discuss Your ISO 45001 Certification Scope
If you are preparing for ISO 45001 certification, share your project activities, sites, workforce and contractor arrangements. Identify the kinds of incident investigation and corrective action records available so Veritas Assurance can review the proposed assessment scope. ISO 45001 certification scope guide
Request an ISO 45001 certification quotation
Disclaimer. This article is for global information and awareness. The scenario, case reference and verification results are illustrative. Refer to the authorised ISO standard for the complete requirements and follow applicable laws, site procedures and contractual obligations for incident response and reporting. Certification is subject to independent assessment and decision.
Frequently Asked Questions
What should a supervisor write in the first report if some facts are still uncertain?
How do we decide how deeply to investigate a near miss?
Who should lead an investigation involving a subcontractor’s worker?
What if the driver’s and worker’s accounts differ?
Can we complete a near-miss investigation if camera footage is unavailable?
How can a worker representative contribute to the investigation?
Does ISO 45001 require the 5 Whys for every incident investigation?
How do we document a cause when a procedure was followed but the control still failed?
When should we check other gates, shifts or projects?
What should an organisation check before introducing corrective action?
What evidence shows that corrective action is working?
How can we verify an action when deliveries are infrequent?
How do we check that an incoming shift understood a safety briefing?
What should another project report back after receiving a safety alert?
When should we reopen an investigation after closing it?
What incident investigation evidence should we have available for an ISO 45001 assessment?