ISO 45001 hazard identification and risk assessment helps organisations determine how work could cause injury or ill health, who may be exposed and which controls are needed. A useful assessment reflects how people actually work across shifts, locations and operating conditions. It also records how the organisation will check that its controls remain effective when the work changes.
This global guide explains how to identify hazards in routine and non-routine activities, assess climate-related occupational health and safety risks, apply the hierarchy of controls, and use an illustrative 5 × 5 risk matrix. It includes sector examples, a completed assessment showing why one control worked for one tooling variant and needed further review for another, and the evidence an auditor may examine. Official ISO 45001 standard · Veritas Assurance ISO 45001 handbook
Hazard, Exposure, Risk and Control
| Term | What it means | Packaging example |
|---|---|---|
| Activity | The task, step or operating condition being assessed. | A technician positions tooling during a line changeover. |
| Hazard | A source or situation with the potential to cause injury or ill health. | A heavy tool must be handled at an extended reach. |
| Exposure | Who encounters the hazard, when and under what conditions. | Technicians and relief workers position the tool on different shifts. |
| OH&S risk | The combination of how likely a hazardous event or exposure is and how severe the resulting harm could be. | A technician could drop the tool and sustain a serious hand injury. |
| Control | A measure used to eliminate a hazard or reduce risk. | A suitable fixture supports the tool during positioning. |
| Residual risk | The risk that remains with the relevant controls in place. | Handling risks remain for tooling that the fixture cannot fully support. |
| Control verification | Checking that a control is in place and performs as intended under relevant working conditions. | Observe changeovers across shifts and tooling variants to check where the fixture provides full support. |
One activity can create several risks. Assess dropped-tool injury and cumulative musculoskeletal strain separately where they require different controls or evidence. ISO/TC 283 technical FAQs
ISO 45001 Clauses That Guide the Assessment
| Clause | Decision the organisation needs to make | Evidence to retain |
|---|---|---|
| 5.4 · Worker consultation and participation | Who should help identify hazards, assess risks and evaluate controls? Include relevant shifts, non-managerial workers and affected groups. | Worker observations, decisions influenced by their input and follow-up communicated to them. |
| 6.1.2.1 · Hazard identification | What could cause harm during routine or non-routine work, foreseeable emergencies or changes? | Task observations, incident reviews, worker feedback and exposure information. |
| 6.1.2.2 · Risk assessment | Which method and criteria will you use? What evidence supports the effectiveness of existing controls? | Documented methodology, reasons for ratings and supporting evidence. |
| 6.1.2.3 · OH&S opportunities | Where could redesign or a different work method improve working conditions? | Options considered, decisions and relevant worker input. |
| 8.1.2 · Hierarchy of controls | Can you eliminate the hazard? What controls suit the exposure that remains? | Control selection records, work instructions and checks of controls in use. |
| 8.1.3 · Management of change | What new hazards could follow changes to equipment, staffing, shifts or facilities? | A change review identifying affected people, owners and checks. |
| 9.1.1 · Performance evaluation | What evidence will show whether a control performs as intended? | Observation, measurement or maintenance results reviewed against defined criteria. |
| 10.2 · Incidents and corrective action | When an incident or finding reveals a gap, what must change and how will the outcome be checked? | Revised assessment, corrective actions and effectiveness checks. |
Identify applicable legal and other requirements under 6.1.3 and address them through your planned actions under 6.1.4. Connect foreseeable emergency situations to the preparedness and response arrangements under 8.2. Official ISO 45001 standard · ISO 45001 handbook · ISO 45002 implementation review
How to Identify Hazards in the Work People Actually Do
List the work. Identify the task, equipment, workplace and people involved. Include setup, cleaning, maintenance and restart where relevant.
Observe it with workers. Ask what changes on other shifts, during peak demand or when contractors and temporary staff take part.
Review available evidence. Use worker reports, incidents, near misses, exposure data, maintenance records and inspection findings.
Describe how harm could occur. An entry such as “operators work beside noisy equipment for most of the shift and may experience harmful noise exposure” identifies the people, conditions and possible harm.
Check for missed activities. Include interruptions, lone work, temporary locations, shutdowns and foreseeable emergencies.
| Hazard group | Examples to consider |
|---|---|
| Safety and mechanical | Moving machinery, electrical energy, vehicles, falls, falling objects and restricted access. |
| Physical agents | Noise, vibration, heat, cold, radiation and unsuitable lighting. |
| Chemical | Dust, fumes, vapours, gases and liquids, including substances generated during work. |
| Biological | Infectious agents, contaminated material or disease vectors where relevant. |
| Ergonomic | Force, awkward posture, repeated movements and equipment that poorly fits the user. |
| Psychosocial | Excessive workload, unclear roles, fatigue, harassment, violence, lone work and limited support. |
Protect worker confidentiality when assessing sensitive concerns. Give field workers, temporary staff and people on different shifts a practical way to contribute. Hazard identification guidance · Official ISO 45003 guidance · Veritas Assurance ISO 45003 information
Risk Assessment Methods and When to Use Them
| Method | When it helps | Typical output |
|---|---|---|
| Workplace walkthrough and worker discussion | To see how actual work differs from instructions. | Observations by task and shift, worker comments and actions. |
| Job Hazard Analysis or Job Safety Analysis | To break a job into steps and identify how harm could occur at each step. | A task assessment for changeover, servicing or field work. |
| Likelihood and severity matrix | To prioritise actions using defined criteria. | A rating, documented assumptions and an action decision. |
| Bow-tie analysis | To examine a serious event and the barriers that prevent it or limit its consequences. | A barrier map with owners and verification arrangements. |
| Specialist exposure or ergonomic assessment | When measurements or competent technical judgement are needed. | Exposure test results or an assessment of a task’s physical demands. |
| Structured “What if?” or change review | To examine changes in equipment, materials, staffing or operating conditions. | A pre-start review showing actions, owners and checks to complete. |
Document the methods and criteria your teams use. A matrix helps prioritise decisions. Where an assessment depends on exposure measurement, equipment design or specialist judgement, obtain that evidence. IEC 31010 risk assessment techniques · ISO/TC 283 risk assessment guidance
Illustrative 5 × 5 Risk-Rating Matrix
This example uses likelihood × severity. ISO 45001 calls for a defined, systematic methodology and criteria. A 5 × 5 matrix is one way to meet that need.
Define likelihood for the assessment period. A single changeover, a typical shift and repeated exposure over several months call for different evidence. Record how exposure frequency, duration and the reliability of existing controls support the rating.
| Score | Illustrative likelihood | Illustrative severity |
|---|---|---|
| 1 | Rare under the conditions assessed. | Minor harm, such as a first-aid injury. |
| 2 | Unlikely under the conditions assessed. | Injury or ill health requiring medical treatment. |
| 3 | Possible during the work assessed. | Serious injury or ill health with substantial recovery time. |
| 4 | Likely under the conditions assessed. | Life-changing injury or permanent ill health. |
| 5 | Very likely under the conditions assessed. | Fatal harm. |
| Likelihood ↓ / Severity → | 1 | 2 | 3 | 4 | 5 |
|---|---|---|---|---|---|
| 5 · Very likely | 5 | 10 | 15 | 20 | 25 |
| 4 · Likely | 4 | 8 | 12 | 16 | 20 |
| 3 · Possible | 3 | 6 | 9 | 12 | 15 |
| 2 · Unlikely | 2 | 4 | 6 | 8 | 10 |
| 1 · Rare | 1 | 2 | 3 | 4 | 5 |
| Illustrative action band | Example response |
|---|---|
| 1–4 · Low | Maintain and check existing controls. Apply any separate escalation criteria. |
| 5–9 · Moderate | Assign an owner and review opportunities for further risk reduction. |
| 10–16 · High | Escalate promptly and determine which controls or approvals are needed before affected work can proceed. |
| 17–25 · Critical | Prevent exposure and escalate for competent review under the organisation’s arrangements. |
Set separate escalation criteria for credible fatal or life-changing consequences, missing critical controls and unmet applicable requirements. For example, likelihood 1 × severity 5 = 5 falls within the moderate band in this model. The fatal consequence still triggers a separate review.
Keep three decisions traceable. Current risk reflects the controls in place today. Projected risk estimates the outcome if a planned control performs as intended. Verified residual risk records the rating after the organisation has evidence that the implemented control works under the conditions assessed. ISO/TC 283 risk assessment guidance
Hierarchy of Controls With Illustrative Examples
Under Clause 8.1.2, start by considering whether the hazard can be eliminated. Continue through the hierarchy as relevant to the work. Several controls may be needed together. Record what each selected control should achieve and how you will check it. Official ISO 45001 standard · NIOSH hierarchy of controls
| Control level | Packaging example | Example from another sector | How to verify |
|---|---|---|---|
| 1. Elimination | Redesign changeover so the tool stays mounted and the hazardous lift is removed. | Move an assembly step to ground level to eliminate work-at-height exposure for that step. Assess any later installation at height separately. | Confirm the hazardous step is gone across the relevant variants and shifts. |
| 2. Substitution | Replace heavy tooling with a lighter compatible design and review any new hazards. | Replace a cleaning product with a less hazardous alternative where the process allows. | Verify that the replacement reduces the intended exposure and assess any new hazards. |
| 3. Engineering controls and reorganisation of work | Provide a suitable fixture that supports the tool during positioning. | Use physical barriers to separate pedestrians from vehicles at a terminal. | Check suitability, condition and performance during representative work. |
| 4. Administrative controls, including training | Update the changeover instructions and train all affected shifts. | Give dispatch staff escalation criteria when route changes could extend a driver’s shift. | Observe whether workers can apply the arrangements during normal work and disruption. |
| 5. Suitable personal protective equipment | Select task-specific protection based on the exposure that remains. | Select suitable protection based on assessed splash or contact exposure in a clinical task. | Check suitability, availability, condition, fit where relevant and use. |
A purchase record shows what equipment was obtained. Observation or measurement during representative work helps establish whether it performs as intended. Hazard prevention and control guidance · Veritas Assurance ISO 45004 performance evaluation
Worked Example — The Packaging Fixture Works for One Variant
A hypothetical food-packing plant reviews a changeover where technicians hold a heavy tool at an extended reach. The team assesses the dropped-tool scenario and records cumulative strain separately.
| Step | What the plant records |
|---|---|
| Observe the task | Observations on two shifts identify where technicians and relief workers hold the unsupported tool. |
| Rate the current risk | Instructions and familiarisation are in place. Workers still support the tool. The team records likelihood 3 × severity 4 = 12, high, and documents the reasons. |
| Select a control and estimate the result | Engineering selects a supporting fixture. The team projects likelihood 1 × severity 4 = 4 if the fixture supports the tool throughout positioning. The improvement depends on a lower likelihood of dropping the tool. The credible severity stays the same. |
| Verify both tooling variants | The fixture supports Variant A throughout the intended step during observed changeovers on both shifts. Variant B still requires manual support during part of positioning. |
| Record the outcome | After applying the site’s separate escalation criteria for a life-changing consequence, the authorised reviewer records 4 as the verified residual rating for Variant A under the assessed conditions. Variant B remains open for reassessment and retains its existing rating until evidence supports a different decision. |
Completed register summary: Changeover → dropped-tool scenario → current risk 12 → fixture selected → projected risk 4 → Variant A verified at 4 → Variant B remains open → engineering owns follow-up and re-verification.
Record who performed the check, when and under which conditions. Review the result when the fixture, tooling or work pattern changes. Veritas Assurance manufacturing industry information
Routine and Non-Routine Activities in ISO 45001 Risk Assessment
Routine work occurs as part of normal operations. Non-routine work may be occasional, infrequent or unplanned. An annual shutdown can be planned and still be non-routine. A familiar task can also need reassessment when it moves to a temporary location or involves different people, equipment or supervision.
Use the same assessment process for both. Ask what changed, who is now exposed, which controls still work and what needs checking. Repeated routine exposure can create significant risk. Infrequent work can bring unfamiliar conditions. ISO/TC 283 guidance on routine and non-routine work
| Sector | Routine work | Non-routine situation | What to reassess |
|---|---|---|---|
| Oil and gas | Normal equipment rounds. | A specialist joins a shutdown while nearby units operate. | Overlapping activities, supervision and coordination. |
| Construction | Trucks use a designated route. | Roadworks divert trucks through a shared area. | Driver visibility, pedestrian crossings and temporary access. |
| Manufacturing | A line runs with its normal safeguards. | A breakdown requires access to a rarely used maintenance area. | Maintenance exposure, safeguards and return-to-service authority. |
| Marine and ports | Cargo follows established routes. | A crane outage changes vehicle and crew movements. | Routes, separation and coordination across teams. |
| Hospital or clinic | Blood collection takes place in an established room. | Refurbishment moves the service to a temporary room. | Sharps disposal, waste routing and exposure across shifts. |
| Education and training | An instructor supervises a workshop class. | An open day brings visitors into the workshop. | Access, demonstration boundaries and supervision. |
| Road transport | Drivers follow an established route. | A diversion introduces an unfamiliar route late in the shift. | Fatigue, remaining work time and revised delivery conditions. |
| Office | Staff handle the usual call volume. | A system outage extends shifts and increases demand. | Workload, recovery time, abusive calls and access to support. |
| Agriculture | Crews harvest in assigned fields. | A heat warning changes timing or location. | Heat exposure, supervision and recovery arrangements. |
| Food processing | Staff follow the established sanitation method. | A product change introduces an unfamiliar cleaning product. | Exposure, equipment suitability and updated instructions. |
| Mining and quarrying | Workers use an established inspection route. | A haul-road change brings vehicles closer. | Visibility, crossings and the inspection location. |
| Chemical processing | A regular supplier uses agreed delivery equipment. | A replacement supplier uses a different arrangement. | Compatibility, responsibilities and authorisation. |
| Power and utilities | Teams inspect equipment through established access arrangements. | Storm damage changes the site and approach routes. | Equipment condition, entry and competent supervision. |
| Water and wastewater | Staff follow the usual inspection route. | Heavy rain floods part of the route. | Whether work can be deferred or performed elsewhere. |
| Waste and recycling | Crews receive familiar waste streams. | Flood recovery generates unusual materials and volumes. | Acceptance criteria, new exposures and instructions for extra workers. |
| Hospitality | Staff follow a regular housekeeping schedule. | A large event changes deliveries and staffing. | Shared routes, handling duties and access to support. |
| Retail | Stock moves along a designated route. | A refit relocates deliveries and storage. | Contractor movement, temporary storage and customer access. |
| Laboratories and diagnostics | Staff receive specimens at the usual point. | Renovation moves receipt to another room. | Containment, routing and responsibility for damaged packages. |
| Data centres and telecommunications | Technicians inspect equipment during staffed hours. | A cooling failure prompts an overnight call-out. | Heat, lone working, access and authority to change plans. |
| Aviation ground handling | Teams follow established turnaround schedules. | Several delayed flights resume close together. | Staffing, communication and overlapping work. |
| Emergency and public services | Teams run inspections and exercises. | Severe weather prompts extended field deployment. | Fatigue, handovers, communications and support. |
Clinical illustration. Before opening a temporary blood-collection room, a clinician and a waste-handling representative review where sharps will be used, disposed of and collected. The clinic checks the setup before opening, observes an early session and schedules another review when the service returns to its usual room. NIOSH bloodborne exposure guidance · Veritas Assurance healthcare industry information
Climate Change and Occupational Health and Safety Risks
Under Clause 4.1, determine whether climate change is relevant to your OH&S management system. The note added to Clause 4.2 draws attention to climate-related requirements that relevant interested parties may have. If climate change is relevant, identify the work affected, evaluate exposure, select controls and check for risks introduced by the changes you make. ISO 45001 climate-action amendment · ISO/PAS 45007 climate-related OH&S guidance
| Condition | What may change at work | What to verify |
|---|---|---|
| Heatwaves and rising temperatures | Outdoor crews, kitchens, foundries, warehouses and drivers may face longer or more intense heat exposure. | Check actual workload, scheduling and access to recovery arrangements against the assessment. |
| Solar ultraviolet exposure | Longer outdoor shifts or different sites may increase exposure. | Verify that scheduling, shade and protection arrangements are available and usable. |
| Heavy rain and flooding | Access, traffic and site conditions change. Cleanup and reopening can introduce different hazards. | Review site checks and the evidence supporting decisions on access or restart. |
| Storms, high winds or lightning | Lifting, port, aviation and outdoor utility work may be disrupted. | Check decisions against applicable operating criteria and verify how changes reached workers and contractors. |
| Wildfire smoke or poor air quality | Exposure can change for outdoor workers and occupants of affected buildings. | Review the information used for decisions, affected teams and how the measures performed. |
| Changing exposure to disease vectors | Outdoor teams may face different seasonal or geographic exposure where locally relevant. | Check that control arrangements reflect the location, season and relevant public health guidance. |
| Changes made to reduce climate-related exposure | New shifts, equipment or work methods may introduce fatigue, reduced visibility or limited access to support. | Observe the changed work and review feedback from the people doing it. |
Worked example — Earlier inspections at a utility. A utility proposes moving afternoon inspections earlier after recurring heat concerns. Workers identify limited light at some sites and reduced supervisor availability at the proposed time. The utility assesses the revised conditions, assigns site-readiness checks and observes representative early shifts before expanding the arrangement.
Evidence trail: Heat reports → climate relevance decision → earlier schedule proposed → visibility and supervision assessed → field checks → worker feedback → review decision. Define what would trigger reassessment, such as a new location, recurring disruption or evidence that workers cannot use the controls. ILO report on work in a changing climate · ISO/PAS 45007
Sector Examples of Hazards, Controls and Verification
These examples show how to link an exposure to a control and verification evidence. Select actual controls through competent assessment of the work and applicable requirements.
| Sector and activity | Hazard and possible harm | Control to evaluate | Verification example |
|---|---|---|---|
| Oil and gas · Routine transfer | A loss of containment may expose workers to hazardous substances. | Design, physical separation and operating criteria. | Check that the selected barriers are available and defects are followed up. |
| Construction · Installing prefabricated elements | Falling objects may strike nearby workers. | Ground-level assembly for suitable steps and separation from work below. | Observe whether separation holds during installation. |
| Manufacturing · Repetitive assembly | Force and awkward reach can cause cumulative strain. | Fixture design, component presentation and workstation layout. | Observe different operators and verify that reach and effort are reduced as intended. |
| Marine and ports · Berth servicing | Pedestrians and vehicles can come into conflict. | Physical separation and defined service access. | Check the route during active terminal operations. |
| Hospital · Routine blood collection | Sharps injuries can expose clinicians, cleaners and waste handlers to bloodborne pathogens. | Suitable safety-engineered devices and disposal at the point of use. | Check availability and use across shifts and review recurring problems. |
| Hospital · Patient transfer | Manual force and awkward posture can injure staff. | Suitable transfer aids, staffing and space. | Observe representative transfers and investigate when staff cannot use the planned aid. |
| Education · Practical workshops | Equipment movement, noise or dust can affect staff and learners. | Lower-exposure teaching methods, safeguards and supervision. | Observe sessions with different groups and schedules. |
| Road transport · Loading and unloading | People and vehicles may share the same area. | Loading-area separation and clear responsibilities at shared premises. | Observe a delivery and verify coordination between driver and site staff. |
| Office · Peak customer support | Workload and abusive calls can contribute to psychological ill health. | Staffing, recovery time and accessible escalation support. | Review anonymised feedback and whether support is usable at peak times. |
| Facilities management · Lone call-out | An incident at an unfamiliar site may delay assistance. | Staffed hours where practicable and suitable communication arrangements. | Sample call-out records and check that contacts and site information were available. |
| Warehousing · Seasonal staffing | Workers may be struck where vehicles and pedestrians share space. | Physical separation and scheduling. | Observe separation during peak loading. |
| Agriculture · Harvesting | Heat, solar exposure and handling can cause harm. | Work timing, shade, recovery arrangements and task redesign. | Check whether seasonal workers can use controls in actual field conditions. |
| Food processing · Sanitation | Cleaning products and wet surfaces can cause exposure or slips. | Safer products, suitable equipment and separation from other work. | Observe sanitation and compare actual products and methods with the assessment. |
| Mining and quarrying · Haul-route inspection | Heavy vehicles and limited visibility can endanger workers. | A relocated inspection point or separation from vehicle movements. | Observe the arrangement during a representative operating period. |
| Chemical processing · Bulk receipt | A release can expose drivers, operators and nearby workers. | Receiving-area design, suitable equipment and delivery checks. | Observe a delivery and review how departures from the plan are handled. |
| Power and utilities · Substation inspection | Unclear boundaries can expose workers to electrical hazards. | Inspection from a safer position and access controls set by competent personnel. | Compare observed work with authorised boundaries and supervision. |
| Water and wastewater · Treatment inspection | Biological exposure and falls near open structures can cause harm. | Remote inspection, physical separation and suitable exposure controls. | Follow the actual route and verify the controls cover the work performed. |
| Waste and recycling · Sorting | Unexpected sharp or contaminated items may harm staff. | Acceptance and handling arrangements for unusual material. | Sample records and check how workers identify and escalate exceptions. |
| Hospitality · Housekeeping | Repeated pushing, reaching and bending can contribute to strain. | Cart design, room layout and workload allocation. | Observe different room layouts and ask staff where handling remains difficult. |
| Retail · Stock replenishment | Falling stock and shared access can harm staff and customers. | Storage access, replenishment timing and separation. | Observe a peak period and check how workers respond to congestion. |
| Laboratories · Specimen receipt | Damaged containers can expose receiving staff, couriers or cleaners. | Containment, segregation and assigned handling responsibilities. | Use relevant records or an exercise to verify reporting and response. |
| Data centres and telecommunications · Equipment upgrades | Electrical, handling and access hazards can affect teams near equipment in service. | Equipment layout, competent supervision and contractor coordination. | Compare access and work arrangements with the approved plan. |
| Aviation ground handling · Turnaround | Moving equipment, noise and time pressure affect several teams. | Separation, coordination and realistic scheduling. | Observe a representative turnaround and review how teams maintain the controls. |
| Emergency and public services · Readiness exercise | Communication gaps and extended work can affect responders and support staff. | Deployment criteria, staffing and handover arrangements. | Review whether teams received updates and obtained support during the exercise. |
Oil and gas · Construction · Manufacturing · Marine, shipping and ports · Healthcare · Education and training · Transport and logistics · Facilities management · Agriculture and food · Mining and metals · Veritas industry directory · ISO standards by industry
What an ISO 45001 Auditor May Examine
An auditor may select a task, speak with the workers involved, observe the work where practicable and compare it with the documented assessment. In the packaging example, the auditor could trace Variant A from the initial rating to the verification result and ask how the organisation manages Variant B while reassessment remains open.
| Auditor’s question | Useful evidence |
|---|---|
| How did you identify the hazard? | Task observations, worker input, incidents or exposure data. |
| Which people and conditions did you assess? | Relevant shifts, temporary workers, contractors, tooling variants and non-routine tasks. |
| Why did you choose this control? | Options considered, applicable requirements and reasons for the decision. |
| How do you know it works? | Observations, checks or measurements tied to its intended purpose. |
| What supports the residual rating? | Defined criteria, assumptions and evidence for the relevant conditions. |
| What happens after a failed check or a change? | The assigned action, review trigger and follow-up evidence. |
Record the limits of the evidence. If the fixture was verified for Variant A on both shifts, say so in the register. Keep the open action for Variant B traceable until further evidence supports a decision. Veritas Assurance audit preparation checklist · Stage 1 vs Stage 2 audit guide · Managing nonconformities
ISO 45001 Certification Information by Country
Select the page relevant to your operations. If your proposed scope spans several countries, identify each location and the work performed there.
| Region | Veritas Assurance country pages |
|---|---|
| Gulf countries | United Arab Emirates · Saudi Arabia · Qatar · Bahrain · Kuwait · Oman |
| Other Middle Eastern countries | Iraq · Jordan · Lebanon |
| North Africa | Egypt · Morocco · Tunisia |
| Asia | India · Malaysia · Singapore · Philippines |
| Europe | United Kingdom |
| North America | United States · Canada |
For UAE applications, review the local steps and quotation factors. How to get ISO 45001 certification in UAE · ISO 45001 certification cost in UAE
Request an ISO 45001 Certification Quotation
Send Veritas Assurance your proposed scope, sites, main activities, workforce and shifts. Identify significant hazards, non-routine work, contractor involvement and any restrictions on observing work. Summarise your assessment methods and the types of control verification records available so the proposed audit arrangements can be reviewed.
Request an ISO 45001 certification quotation
Article disclaimer. This guide is for global information and awareness. The scenarios, ratings and decision rules are hypothetical. Use competent assessment, the authorised ISO standard and applicable legal, contractual and site requirements when selecting controls or authorising work. Certification is subject to independent assessment and a certification decision.
Frequently Asked Questions
Does ISO 45001 require a 5 × 5 risk matrix?
Should we rate risk before or after taking existing controls into account?
What if two tasks have the same score but one could cause a fatal injury?
Can we lower the projected score as soon as a new control is purchased?
What should we record when the same control works for one product variant only?
Does a planned annual shutdown count as non-routine work?
What should we reassess when a familiar task moves to a temporary location?
How do we assess a hazard when exposure data are limited?
Should the risk register show why a higher-level control was rejected?
How can we show that worker input influenced a risk assessment?
Do we need to update the risk assessment when we move work to cooler hours?
How can we tell whether a new control reduced risk if the task has never caused an injury?
What should we show when our procedure and actual work differ?
Our contractor has its own assessment. What should our team review?
What should we share with Veritas when a significant task happens only on weekends?
Request an ISO 45001 Certification Quotation
Share your operating sites, main activities, workforce and relevant hazards. Include non-routine work, contractor activities and any audit access restrictions so Veritas Assurance can review the proposed assessment arrangements.